The final section of the “Brookvale to Narrabeen Line Tramway Part 3” was notified on 28 October, 1912 and confirmed early in 1913. It was described as being from Collaroy Beach via Ocean Street and Victoria Street (Narrabeen Bridge). The line was constructed by Public Works Department day labour with work commencing on 18 August 1913 and was completed in less than four months being handed over to the tramway department on 4 December, 1913 following a successful trial run. The extension comprised one mile 26 chains of single track with the steepest grade 1 in 20 and the sharpest curve of 660 feet radius. Catenary type overhead was used matching that between Brookvale and Collaroy. The total cost was £13,720 which included the goods depot and siding at Narrabeen.

Stopping places were located at Fraser Street, Pacific Loop, Clark Street, Devitt Street, Narrabeen Street, lagoon waiting room terminus.

nickbelshaw

Author nickbelshaw

More posts by nickbelshaw
Der Gewinn ist auch lediglich 3-mal durchzuspielen, wobei Ihnen was Finale maximal twenty five € ausgezahlt sein. vulkan vegas Das Online Casino muss mit einer nahezu perfekten Bonus-Offerte aufwarten. slots mit Wird Roulette oder Blackjack gespielt, erfährt man eine Anrechnung von 15%. vulkan vegas Das geht ab 0, 20 Euro u Drehung und ist auch damit sehr schonend für das Price range. auch die